Strengths
|
Strengths
Total area: 1.852 ha with 13 industrial park members included Main route: 36m road. - Large free land, low rental fee consistent with project needs large area. Investors can easily access to engineering infrastructure, society, labor force and Ho Chi Minh City’s services such as: • Hoc Mon district center – HCMC. • Northwest Cu Chi Urban Area – size: 6,028 ha. • Urban Area and Berjaya International University – size: 925 ha. • Ring road No.3 following regional planning of HCMC. • Trans-Asian axis connecting HCMC and Cambodia.
|
Position
See location map on Google maps
|
Position
See location map on Google maps
- East: Being contiguous to North East Industrial Park of HCMC, Thay Cai channel, Berjaya International University – Urban area of HCMC, Xuyen A Industrial area and channel…- East: Being contiguous to 36 m exposure road.- Being located between 3 large residential areas of Duc Hoa Town, Hau Nghia Town (Long An),Cu Chi Town and Hoc Mon Town (HCMC)- Being located at Cu Chi North West (HCMC) urban area. 13 industrial park members:1. Duc Hoa III - Minh Ngan2. Duc Hoa III - Resco3. Duc Hoa III - Song Tan4. Duc Hoa III - Thai Hoa5. Duc Hoa III - Hong Dat6. Duc Hoa III - Anh Hong7. Duc Hoa III - Slico8. Duc Hoa III - Viet Hoa9. Duc Hoa III - Lien Thanh10. Duc Hoa III - Duc Loi11. Duc Hoa III - Long Duc12. Duc Hoa III - Muoi Day13. Duc Hoa III - Long Viet
|
Investment incentives
|
Investment incentives
Free of 02 years, 50% in the next 04 years. 17% corporate income tax. Click here for more detail
|
Performance duration
|
Performance duration Until 2058
|
Leasing price and mode of payment
|
Leasing price and mode of payment
- Leasing prices: time varying.
|
Factory lease price
|
Factory lease price
|
Infrastructure management fees and other services
|
Infrastructure management fees and other services
|
Water rates
|
Water rates
|
Fee Wastewater Treatment
|
Fee Wastewater Treatment
|
Electricity price
|
Electricity price Click here for more detail
|
Functional block
|
Functional block
|
Land use structure
|
Land use structure
|
Scope of permitted investments
|
Scope of permitted investments - The industry of mineral processing and construction materials production. - Mechanical industry: manufacturing equipment and spare parts for industry, manufacturing products for the transportation industry, metallurgy, power and lifting equipment, metalworking ... - Electronic industry - information technology: computer equipment manufacturing, production consumer electronics, electronic assembly ... - Consumer industry: textile, garments, embroidery, footwear, handbags, dyestuff industry, plastic industry, ceramic industry executive glass, industrial processing of agricultural, forestry and fishery - seafood , food industry, chemical industry, cosmetics, spices, wood, paper, carton ... - Light industry, such as production equipment for teaching or sports equipment, advanced materials manufacturing, rubber, adhesives, polymers ... - The other industries using less water and fewer environmental pollutants.
|
Climate
|
Climate
Long An is located in a tropical monsoon and equatorial area with stable and high temperature background around the year and it has two distinctive rainy and sunny seasons but Duc Hoa dst. is affected by monsoons with more rains. Annual average temperature: 27.7 degrees Celsius
|
Topography and geology
|
Topography and geology
|
Waste water
|
Waste water
Follow current Vietnam's standards
|
Fire prevention and protection
|
Fire prevention and protection Fire protection system complies with the current regulations of the government
|
Infrastructure
|
Infrastructure |
Traffic system
|
Traffic system Road No.8 which is in good condition, covered with tar and is currently 8m wide (will be extended to 40m). Internal road system developed by DUC HOA III to access to factory. The roads are under construction and planned as follows: Inter-road network including 2 main roads: + Road N4: 36m (alongside South border of Industrial Park) + Road D1: 32m (alongside the West border of Industrial Park) + Road-lane: 4 Internal roads + Width: 18 – 22m + Road-lane: 2 – 4
|
Electricity supply system
|
Electricity supply system
Electricity Company and currently promoting 110Kv power line for DUC HOA III industrial parkCurrent local grid of 22 kV, capacity 40+63MVA, by Long An Electricity Company (EVN’s affiliate)
|
Water supply system
|
Water supply system
Water supply: Water supply for DUC HOA III industrial park is from both sources which are PHU MY VINH Water Plant Supply (15,000 m3/day) and KENH DONG WATER SUPPLY’s pipeline (30,000 m3/day). The sustainable pressure for water is 2.5 – 3kg/cm2.Restriction on water consumption: The water can be consumed in the whole year. There is no restriction on water consumption
|
Wastewater treatment system
|
Wastewater treatment system
Design capacity: 10.000 m3/dayThe requirement to have a waste water treatment on site is depended on the quality of wastewater. The customer’s discharged waste water is required to meet level B of Vietnam waste water treatment standards and then level B waste water will be discharged to DUC HOA III industrial park waste water treatment plant to treat to level A waste water before discharging to the environment.▪ If, the customer’s discharged waste water already meets level B of Vietnam waste water treatment standards; so, there is not required to have a waste water treatment plant on site. ▪ If, the customer’s discharged waste water dose not meet level B of Vietnam waste water treatment standards; so, there is required to have a waste water treatment plant on site. Note:― Duc Hoa III industrial park is responsible for wastewater treatment column A value before discharge into the environment.― In case the factory has all kinds of waste water produced other characteristics, the application of standards compliance QCVN 24:2009 / BTNMT.
|
Post and telecommunication system
|
Post and telecommunication system • Communication system in Duc Hoa III Industrial Park is allowed to connect to Long An Telecommunication network.
• Its local system will be a telephone cable network with estimated subscription of 2,223, meeting sufficient requirements on telecommunication service in the industrial park.
|
Public utilities
|
Public utilities
- Temporary houses for workers with 4,98 ha in area to serve accommodation for 2,400 people, - Residential area 67 ha serves for workers and experts who work in IP.C33
|
Supporting services
|
Supporting services |
Free services
|
Free services
|
Supporting service
|
Supporting service
|
Typical clients
|
Typical clients
|
Customer List
|
Customer List
Click here for more detail
|
Investor
|
13 industrial park members: 1. Duc Hoa III - Minh Ngan 2. Duc Hoa III - Resco 3. Duc Hoa III - Song Tan 4. Duc Hoa III - Thai Hoa 5. Duc Hoa III - Hong Dat 6. Duc Hoa III - Anh Hong 7. Duc Hoa III - Slico 8. Duc Hoa III - Viet Hoa 9. Duc Hoa III - Lien Thanh 10. Duc Hoa III - Duc Loi 11. Duc Hoa III - Long Duc 12. Duc Hoa III - Muoi Day 13. Duc Hoa III - Long Viet
|
Documents
|
|